Luup Design · Elysian Valley · Phase 1 — Development Capacity Study
Phase 1 Proposal — EV-001-P1 / 2026
Bali · June 2026

What can
we build.

Before any design or permit, one question has to be answered with certainty: how much can legally stand on this land. Phase 1 is a focused Development Capacity Study that fixes the buildable envelope for Elysian Valley — the foundation every later decision, drawing and permit depends on.

Prepared for
Elysian Valley Development
Prepared by
Luup Design
Engagement
Phase 1 — Capacity Study
Objective
What & how much can be built
Land Size
9,300 m²
Duration
2 weeks
Phase 1 Fee
IDR 100,000,000 excl. VAT
Credit
100% creditable to full design fee
01 — Phase 1

Settle the envelope first.

Unit count, saleable area, massing and value are governed by zoning — not by ambition. The Development Capacity Study establishes, on paper and to scale, exactly what the 9,300 m² site permits: the maximum footprint, buildable floor area, height, and realistic unit yield across the four planned typologies. It is a small, fast, low-commitment first step that de-risks every decision and every rupiah that follows.

The One DeliverableA definitive answer, on paper.

  • Development Capacity Report — the permitted building envelope
  • Maximum footprint, buildable GFA, storeys & height
  • Realistic unit yield across the four typologies
  • A one-page summary suited to financing conversations

Why It Comes FirstEverything downstream depends on it.

  • Saleable area and unit count are set by zoning, not by intent
  • Setbacks and the river boundary reshape the scheme early
  • The PBG permit is built on the envelope this study fixes
  • Designing before it is known risks expensive rework
02 — Scope

What the study covers.

A focused regulatory and massing study. Architectural and planning scope only — no engineering, no detailed design, no permit lodgement at this stage. Those follow once the envelope is approved.

Regulatory EnvelopeWhat the land legally permits.

  • Confirm spatial conformity — KKPR / KRK against the local spatial plan (RDTR)
  • Establish the zoning envelope — KDB (building coverage), KLB (floor-area ratio), KDH (green area), GSB (street setback), and height / storey limits
  • Map river / waterway setbacks (sempadan sungai) and any easements affecting buildable area

Massing & YieldHow much we can actually build.

  • Massing optimisation — test scenarios to maximise permitted GFA within the envelope
  • Indicative unit yield per typology (Townhouse T1, Townhouse T2, Villa, Apartment Building)
  • Parking and circulation feasibility tested against the permitted footprint
  • Diagrammatic site massing to communicate the recommended scheme

DeliverableDevelopment Capacity Report.

  • Maximum footprint and buildable GFA, reconciled to the zoning envelope
  • Storeys, height and parking provision
  • Recommended development scenario with indicative unit yield
  • One-page capacity summary formatted for financing and decision-making
03 — Delivery

Two weeks to the answer.

A tight, focused engagement delivered in two weeks. Note that third-party zoning confirmations from the planning office can take additional time outside Luup's control; where this affects the timeline we proceed on the best available data and flag the dependency clearly.

Week 1

Regulatory Envelope & Constraints

Pull and confirm zoning parameters (KKPR / RDTR), establish KDB, KLB, KDH, GSB and height limits, and map river / waterway setbacks against the site boundary.

Outcome — Confirmed regulatory envelope and constraints map.
StageWeek 1
Week 2

Massing, Yield & Capacity Report

Test massing scenarios across the four typologies to maximise permitted GFA with parking and circulation feasibility, converge on a recommended scenario, then compile and present the Development Capacity Report with one round of review.

Outcome — Approved Development Capacity Report — the buildable envelope, fixed.
StageWeek 2

Required Client InputsNeeded for an accurate study.

  • Certificate of title / land documents (SHM / HGB) and site boundary survey
  • Topographic survey of the site if available (improves accuracy; not produced under this scope)
04 — Fee

Costing for Phase 1.

A single lump sum for the Development Capacity Study. The full fee is credited against the total design fee should the Client proceed to the design programme — making this first step effectively cost-free if the project goes ahead. All amounts in IDR, exclusive of VAT.

100% creditable to full scope Excludes VAT
Schedule of Fees
Service Basis Subtotal (IDR)
Development Capacity Study — regulatory envelope, massing optimisation & Capacity ReportLump sum100,000,000
Total Phase 1 Fee — excl. VAT100,000,000
Indicative EUR Equivalent
≈ €4,800
At 1 EUR = 21,000 IDR · indicative only
Credited to Full Scope
IDR 100,000,000
Credited in full against the total design fee if the Client proceeds to the full programme
Payment Schedule
1. Advance
50%
IDR 50,000,000
Paid on signing — kicks off the study
2. Report Delivery
50%
IDR 50,000,000
On delivery of the Development Capacity Report
05 — Next

The path after Phase 1.

With the envelope fixed, the project moves into permitting and design. These phases are shown for context only — they are quoted separately once the Capacity Report is approved and the scheme direction is set.

Phase 2

Schematic Scheme & PBG Permit

Develop the masterplan and schematic design to permit standard, produce the certified technical documentation (architectural, structural, MEP), and lodge and manage the PBG building approval through SIMBG to issuance.

Outcome — Issued PBG — the project legally permitted to build.
ScopeQuoted next
Phase 3

Full Design Programme

The complete engagement already proposed — architecture, interior & FF&E, landscape, signage, structural and MEP coordination, full construction documentation and bill of quantities, through to construction administration.

Outcome — Build-ready documentation across all disciplines.
ScopePer main proposal
06 — Terms

Phase 1 terms.

Ground-rules for this engagement — credit to full scope, approvals, intellectual property, and exclusions.

Credit to Full Design Scope

Should the Client proceed with the full Elysian Valley design programme, the entire Phase 1 fee — IDR 100,000,000 — is credited against the total design fee. The capacity study work carries directly into the full programme, so this first step is effectively cost-free if the project goes ahead.

Nature of the Study

The Development Capacity Report is a planning-stage assessment of buildable capacity based on prevailing zoning rules and the best available site data. It is not a permit and does not guarantee any specific authority approval; final parameters are confirmed at PBG stage in Phase 2.

Approvals & Payments

The report is submitted for approval with one round of review included. Invoices are paid within 7 days; late balances over 30 days incur a 2% monthly fee. All fees exclude VAT, added at the prevailing rate.

Intellectual Property

The Capacity Report and all working material remain Luup Design's property until paid in full, after which a non-exclusive licence is granted for the purpose of progressing this project only.

Scope Exclusions

  • Engineering of any discipline (structural, MEP)
  • Detailed architectural, interior or landscape design
  • PBG technical documentation and permit lodgement — Phase 2
  • Topographic survey, geotechnical investigation, land legal due diligence

Binding Agreement

This Phase 1 proposal is binding upon acceptance and signature by both parties. Signing is handled separately via PandaDoc. Validity: 30 days from the date of issue.

Client
Elysian Valley Development
Name
Date
Luup Design
Canggu, Bali
Name
Date